skip to main |
skip to sidebar
The first layer of the SBS roof has been put down. You can see the red primer on the parapet. The membrane has been lapped up over the parapet and we are waiting for the granular cap sheet to be applied.
This is the South elevation of the Third Floor Garden Room.
Main floor of the South side of the duplex looing West towards the entry.