The first layer of the SBS roof has been put down. You can see the red primer on the parapet. The membrane has been lapped up over the parapet and we are waiting for the granular cap sheet to be applied.
This is the South elevation of the Third Floor Garden Room.
Monday, November 17, 2008
Subscribe to:
Posts (Atom)